Get Fast Quote

There are four ways to get construction workers onto a Singapore site: hire them directly onto your own quota, take them on contract from a manpower supplier, subcontract the work package, or bring in project hires for a fixed period. Which one fits depends on how long you need them, whether you have quota headroom, and how much admin you want to carry.

For companies hiring manpower in Singapore. Looking for work? Go to Careers.

What to prepare before you call anyone

  • The trade list — not "workers", but general workers, carpenters, steel fixers, welders with the process you need, scaffolders, riggers, operators.
  • Headcount per trade, and whether it ramps.
  • Start date and duration — the single thing that changes a quote the most.
  • Site and working hours, including shift or weekend work.
  • Supervision — who on your side directs the crew daily.
  • Site requirements — safety induction, PPE standards, any client-specific clearance.
Get Fast Quote

The four routes, and when each one fits

Hire directly. You sponsor the work pass, you carry the quota and levy, you handle housing, insurance and repatriation. Makes sense for core crew you expect to keep for years. The constraint is quota headroom and the admin that comes with every pass.

Take workers from a manpower supplier. The worker stays on the supplier’s payroll and pass and works on your site under your supervision. You pay a rate per worker. Makes sense when the need is project-length, when your quota is full, or when the trade mix changes month to month.

Subcontract the package. You hand over a scope — the formwork, the M&E rough-in — and the subcontractor brings his own men and his own supervision. Makes sense when the scope is clean and separable.

Project hires. Short, fixed-duration hiring for a peak, a shutdown or a handover push.

Most main contractors use two or three of these at once. The question is rarely which one — it is which one for which part of the crew.

Direct hire Manpower supply
Who holds the work pass You The supplier
Who carries quota and levy You The supplier
Housing, insurance, repatriation You The supplier
Lead time Longer — pass application and clearance Shorter — workers already in Singapore
If the project ends early You carry the worker Deployment ends
If a worker does not work out Your problem to solve Replacement requested from the supplier
Cost shape Lower rate, higher admin and risk Higher rate, admin carried by the supplier

Questions to ask any manpower supplier

A supplier who answers all eight in writing is one you can plan around. One who answers only on price is not.

  • Who employs the worker, and whose pass is he on?
  • What happens if a worker is absent, or is not performing?
  • Are the workers already in Singapore, or does this depend on new passes?
  • What do the workers’ training records look like, and will you send them before deployment?
  • Who supervises on site — us or you?
  • How is overtime charged, and what is the basis of the rate?
  • What is your notice period if we stand the crew down early?
  • Can you cover other trades on the same site later?

Mistakes that cost the most

  • Hiring on headcount instead of trade. Ten general workers cannot do what three carpenters and two steel fixers do.
  • Leaving the start date vague. Deployment is scheduled work, and a date that moves twice costs you the crew’s availability.
  • Not agreeing supervision up front. If nobody on your side owns the crew daily, productivity drops and both sides blame the other.
  • Comparing rates without comparing what is inside them. Payroll, pass administration, insurance, PPE and replacement cover are either in the rate or they are your problem later.

Frequently Asked Questions

1. How quickly can construction workers start on site?▾
It depends on the trade and whether the workers are already in Singapore. Workers already deployed locally start sooner than any route requiring a new pass. Tell us the date you need and we will tell you what is realistic for that trade.
2. Do we need our own quota to use supplied workers?▾
No. Workers supplied on contract remain the supplier’s employees and sit on the supplier’s quota and passes. That is the main reason contractors use supply when their own quota is full.
3. Who supervises supplied workers on our site?▾
You do. They work to your programme and your site instruction, the same as your own crew. A supervisor can be supplied alongside the crew if you would rather have one person accountable for the gang.
4. Can we hire the worker permanently later?▾
That is a conversation to have before deployment, not after. Terms vary and should be written into the agreement up front.
5. What trades can be supplied?▾
General workers, carpenters, steel fixers, masons, welders, electricians, plumbers, scaffolders, riggers and signalmen, equipment operators and site supervisors.
6. What does it cost?▾
Rates are quoted per worker on a day or monthly basis, depending on trade, duration and shift pattern. Send the six items above and you will get a rate you can budget against.

Request a quote

Tell us the site, the scope and your start date.

Are you ready for a better & more efficient business?  Get started

Request Quote